Sign in to confirm you’re not a bot
This helps protect our community. Learn more
Comments are turned off. Learn more
Votator® II SSHE Maintenance - General Heat Exchanger Disassembly - WCB
12Likes
4,550Views
2017Jan 16
Part one of the complete WCB Votator® II Scraped Surface Heat Exchanger maintenance video runs 7 minutes and covers these maintenance procedures: location and the importance of the Votator II nameplate, removing the rotary joint from locknut, removing the plastic locknut safety cover, removing the non-drive end safety cover / bearing retainer, removing the shaft locknut on the non-drive end, preparing and removing the non-drive end head, and preparing and removing the mutator shaft. Optional procedure: removing the non-drive end extra heavy duty head. Continue watching the Votator II Scraped Surface Heat Exchanger maintenance videos, parts 2-5, by continuing to watch this playlist.

Follow along using the transcript.

SPX FLOW, Inc.

8.53K subscribers