Mid-Canal Storage Project
0Likes
318Views
Oct 212024
CVWD’s Mid-Canal Storage Project, completed this summer, made critical storage and operational efficiency upgrades to the 123-mile Coachella Canal. Construction included removing concrete lining in a 4.9-mile section of the canal where clay, soil and water pressure caused extensive cracks, causing water seepage and increased repair costs. The in-line reservoir stores up to 728 AF. The $7.5 million project was funded in partnership by CVWD, San Diego County Water Authority, and San Luis Rey River Indian Water Authority through a low-interest loan from Reclamation.